John Williams Cover Image
User Image
גרור כדי למקם מחדש את הכריכה
על אודות

I remember a few years back when I was working with a small clinic that was struggling to keep up with all the regulatory changes. We decided to dive into MIPS, and it was a game-changer. We started by revamping our patient record system to ensure everything was up-to-date and integrated. It was a lot of work at first, but we saw significant improvements in patient care. For instance, our diabetes management program became more efficient, with better tracking and follow-up, leading to improved patient outcomes. Plus, the financial incentives we received from performing well in MIPS categories allowed us to invest back into the clinic, upgrading our equipment and expanding our services. It was a challenging but rewarding experience that showed me firsthand how MIPS can drive positive changes in healthcare practices.

חברי משפחה
Warning: Undefined array key "user" in /www/wwwroot/vevioz.com/themes/vevioz/layout/timeline/content.phtml on line 748

Warning: Trying to access array offset on null in /www/wwwroot/vevioz.com/themes/vevioz/layout/timeline/content.phtml on line 748

Fatal error: Uncaught TypeError: count(): Argument #1 ($value) must be of type Countable|array, false given in /www/wwwroot/vevioz.com/themes/vevioz/layout/timeline/content.phtml:761 Stack trace: #0 /www/wwwroot/vevioz.com/assets/includes/functions_general.php(45): require() #1 /www/wwwroot/vevioz.com/sources/timeline.php(266): Wo_LoadPage() #2 /www/wwwroot/vevioz.com/index.php(941): include('...') #3 {main} thrown in /www/wwwroot/vevioz.com/themes/vevioz/layout/timeline/content.phtml on line 761